Bulletin Staff Report

Shane Campbell uses a cutting torch to prepare the joints between two separately paved sides of the bridge over Pecan Bayou for completion as surface improvement work continues along Early Boulevard and into Brownwood on East Commerce. Contractor for the Texas Department of Transportation project is Prater Equipment of Comanche.